
The Design Advisory Panel reviewed the Savage Fire Station project last night, 12/9/09. This is an image of the project submitted by the applicant. The panel recommended the applicant consider a few design changes to the building. The applicant now has the opportunity to make design changes or to respond to the recommendations.
Howard County Design Advisory Panel Contacts:
Dace Blaumanis - 410-313-4324
Mary Smith - 410-313-4352

The Design Advisory Panel (DAP) reviews development, redevelopment and construction projects within the US Route 1 Corridor and age restricted adult housing that requires a conditional use permit.
Purpose: To improve design compatibility with surrounding development, to promote revitalization, and to enhance property values, the DAP process encourages excellence in the project’s architecture and site design.
3 comments:
Love it! very contemporary. Certain parts of Savage could use a facelift.
I'm so happy for the SVFC that the fire house will be moved outside of the residential area of Savage! It seems like most calls are out on Rt. 1 anyway and this should improve response times. The old fire house is outdated and too small. No more sirens at 6 a.m.
Indeed, a very clever idea to move the firhouse out of Savage.
Post a Comment